| 1. | Distortion monitoring on intake of underground power station at the right bank in tgp 三峡工程右岸地下电站进水口施工期变形监测及特征 |
| 2. | Analysis on elastic and plastic value of rocks surrounding underground power station of longtan project 龙滩水电站地下厂房洞室围岩弹塑性数值分析 |
| 3. | Anchorage cable construction on intake side slope and quality control in sanxia underground power station 三峡地下电站进水口边坡锚索施工及质量控制 |
| 4. | Vibration safety monitoring of high side slope under explosive excavation in underground power station inlet of right bank of three gorges project 三峡右岸地下电站进水口高边坡开挖爆破震动安全监测 |
| 5. | Make use of these achievement and test data , the numerical computation of ming tomb underground power station was carried out , and its average elastic modulus and the elastic resisting force of surrounding rock were obtained 结合十三陵抽水蓄能电站地下厂房结构的振动测试资料,对其进行动力反演计算分析,得到厂房混凝土材料的平均动弹模和混凝土与外围岩石之间的传力形式。 |